2 tracked · by stage: MOU 1 · Under review 1 · updated 2026-10-24
Leading projects (top 2 by stage)
Project
Stage
Technology
Source
ZWE KHNP iSMR KHNP signs MOU with Zimbabwe's CEIRD for 170MW i-SMR feasibility study, training, and tech sharing
Under review
SMR
📎 Power Limited DB
ZIM ROSATOM COOPERATION Nuclear Plant Construction Feasibility Study and Joint Bilateral Cooperation Working Group Launched
MOU
TBD (Policy Stage)
📎 Power Limited DB
🔒 The full list of 2, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s
reading of them — are available on the interactive map
and through YouTube membership.