⚡ PowerLimit Data Map

Ukraine nuclear & power projects

82 tracked · by stage: Under review 48 · Operating 12 · Construction 8 · MOU 8 · EDA 3 · Approved 1 · updated 2026-10-24

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Zaporizhzhia
VVER reactor output increase through maintenance and safety upgrades
OperatingRestart📎 Power Limited DB
Khmelnitski, South Ukraine, Rovno
Westinghouse-Supplied VVER-440 Fuel Loaded into Reactor at Ukraine’s Rivne Nuclear Power Plant for First Time
In operationRestart📎 Power Limited DB
National (15 units)
Westinghouse signs fuel supply contract for all nuclear plants, begins VVER-440 fuel production in late 2023,
OperatingRestart📎 Power Limited DB
Chernobyl
Russian forces withdraw after occupation; IAEA provides safety support
OperatingRestart📎 Power Limited DB
Zaporizhia
Operational control lost following Russian military occupation; operations continue under IAEA monitoring
OperatingLarge Nuclear Plant📎 Power Limited DB
Zaporizhia
Calls to ensure safe operation amid war; no radiation leaks
OperatingLarge Nuclear Plant📎 Power Limited DB
Zaporizhia
Unit 4 disconnected from grid after gas leak in turbine-generator cooling system; emergency power supplied fro
OperatingRestart📎 Power Limited DB
Chernobyl
Unit 4 New Safe Confinement (NSC) operating license obtained; radioactive waste reprocessing and storage move
OperatingRestart📎 Power Limited DB
Rovno
VVER-440 Fuel Diversification: Contract Signed with Westinghouse for 1,056 Fuel Assemblies
OperatingRestart📎 Power Limited DB
Khmelnitsky
Groundbreaking held for two AP1000 units (Units 5 and 6), with US EXIM financing, ending reliance on Russian r
ConstructionLarge Nuclear Plant📎 Power Limited DB
Khmelnitsky
Construction of Khmelnitsky Unit 4 set to resume
ConstructionLarge Nuclear Plant📎 Power Limited DB
Zaporozhye
Zaporozhye Units 1–6 condenser replacement and modernization project scheduled for completion in 2022–2023
ConstructionRestart📎 Power Limited DB
Voznesensk
VVER-1000 fuel self-sufficiency initiative
ApprovedTBD (Policy Stage)📎 Power Limited DB
UKR HOLTEC SMR160
First SMR-160 unit targets commissioning by March 2029; up to 20 units planned; local manufacturing facility p
EDASMR📎 Power Limited DB
Zaporozhe
Power system inspections conducted to connect Zaporozhe Unit 1 to European grid; TSO certification and ancilla
EDARestart📎 Power Limited DB
🔒 The full list of 82, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.