82 tracked · by stage: Under review 48 · Operating 12 · Construction 8 · MOU 8 · EDA 3 · Approved 1 · updated 2026-09-08
| Project | Stage | Technology | Source |
|---|---|---|---|
| Khmelnitski, South Ukraine, Rovno Westinghouse VVER-440 Fuel Loaded at Ukraine's Rivne NPP, Ending Russian Dependence | In operation | Restart | 📎 Power Limited DB |
| National (15 Units) Westinghouse Secures All Nuclear Fuel Supply, VVER-440 Fuel Production by Late 2023, Fuel Plant Agreement Sign | Operating | Restart | 📎 Power Limited DB |
| Chernobyl Russian Forces Withdraw After Occupation; IAEA Provides Safety Assistance | Operating | Restart | 📎 Power Limited DB |
| Zaporizhia Loss of Operational Control Due to Russian Occupation; IAEA Monitoring Operations | Operating | Large reactor | 📎 Power Limited DB |
| Zaporizhia Call for Safe Operation Amidst War, No Radiation Leakage Reported | Operating | Large reactor | 📎 Power Limited DB |
| Zaporizhia Unit 4 Disconnected from Grid Due to Turbine Generator Cooling System Gas Leak, Emergency Power from Belarus | Operating | Restart | 📎 Power Limited DB |
| Zaporizhzhia VVER Reactor Maintenance and Safety Upgrades to Boost Output | Operating | Restart | 📎 Power Limited DB |
| Chernobyl Unit 4 New Safety Shielding Structure (NSC) Operating License Obtained, Radioactive Waste Reprocessing and Sto | Operating | Restart | 📎 Power Limited DB |
| Rovno VVER-440 Fuel Diversification: Westinghouse Contracted for 1,056 Fuel Assemblies | Operating | Restart | 📎 Power Limited DB |
| Khmelnitsky Groundbreaking for AP1000 Units 5 & 6, US EXIM Financing, Ending Reliance on Russian Reactors | Construction | Large reactor | 📎 Power Limited DB |
| Khmelnitsky Khmelnitsky Unit 4 Construction to Resume | Construction | Large reactor | 📎 Power Limited DB |
| Zaporozhye Zaporozhye Units 1-6 Condenser Replacement and Modernization Project, Expected Completion 2022-2023 | Construction | Restart | 📎 Power Limited DB |
| Voznesensk VVER-1000 Fuel Self-Sufficiency Initiative Underway | Approved | Undecided (Policy stage) | 📎 Power Limited DB |
| UKR HOLTEC SMR160 SMR-160: First Unit Commissioning by March 2029, 20 Units Planned, Local Manufacturing Eyed | EDA | SMR | 📎 Power Limited DB |
| Zaporozhe Zaporozhe Unit 1 Grid Inspection for European Grid Integration, TSO Certification and Ancillary Services Regis | EDA | Restart | 📎 Power Limited DB |