⚡ PowerLimit Data Map

Rwanda nuclear & power projects

6 tracked · by stage: Under review 3 · MOU 2 · EDA 1 · updated 2026-10-24

Leading projects (top 6 by stage)

ProjectStageTechnologySource
Rwanda IAEA SMR
Targets SMR operation in the early 2030s; strengthening regulatory framework and conducting site surveys
EDASMR📎 Power Limited DB
RWANDA DUALFLUID DEMO DUALFLUIDREACTOR
Rwanda's nuclear agency and Canadian-German Dual Fluid sign agreement to develop a dual-fluid demonstration re
Under reviewDual Fluid reactor (Dual Fluid/Gen V📎 World Nuclear News
RWANDA NANO NUCLEAR SMR MICROREACTOR
NANO Nuclear signs MoU with Rwanda Atomic Energy Board for technical support and training to deploy SMRs, incl
Under reviewSMR/Microreactor📎 World Nuclear News
RWA RAEB SMR
Rwanda considers SMR deployment, aiming to boost manufacturing, currently 8–9% of GDP, through greater domesti
Under reviewSMR📎 Power Limited DB
RWA ROSATOM NUCLEAR
Agreement reached with Rosatom to build nuclear power plant
MOUTBD (Policy Stage)📎 Power Limited DB
RWA NANO SMR
MOU signed with Nano Nuclear Energy for SMR and microreactor deployment, technical support and workforce train
MOUSMR📎 Power Limited DB
🔒 The full list of 6, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.