641 tracked · by stage: Under review 358 · MOU 93 · Operating 84 · Construction 66 · EDA 29 · In operation 4 · updated 2026-09-08
| Project | Stage | Technology | Source |
|---|---|---|---|
| Kursk II VVER-TOI: Unit 1 Grid Connected, Unit 2 Under Construction, Units 3-4 Planned by 2034 | Operating | Large reactor | 📎 Power Limited DB |
| Pevek, Chukotka Russia's Akademik Lomonosov Floating NPP Exceeds 1 Billion kWh Cumulative Power Generation | In operation | SMR | 📎 Power Limited DB |
| Pevek, Chukotka Arctic Russia's Akademik Lomonosov Floating NPP to Heat Pevek by Year-End | In operation | Floating Nuclear Power Plant (KLT-40S Small Reactor) | 📎 World Nuclear News |
| Rostov Nuclear Power Plant Unit 2 Rosatom Begins Final 18-Month Cycle for ATF at Rostov 2 VVER-1000 | In operation | Accident-Tolerant Fuel (ATF) | 📎 World Nuclear News |
| Chukotka Nagleinyn Russia's Akademik Lomonosov Floating NPP Begins First Full Core Refueling | In operation | SMR | 📎 Power Limited DB |
| Beloyarsk BN-800 Fast Reactor Fully Loaded with MOX Fuel, Advancing Waste Reduction and Closed Fuel Cycle | Operating | Large reactor | 📎 Power Limited DB |
| Kola Kola NPP Produces First Commercial-Scale Hydrogen for Turbine Cooling | Operating | Large reactor | 📎 Power Limited DB |
| Arctic Route Nuclear Icebreaker Sibir Delivered with Two RITM-200 Reactors | Operating | SMR | 📎 Power Limited DB |
| Kola VVER-440 RK-3 New Fuel Successfully Completes 5 Cycles, Demonstrating Fuel Efficiency and Potential for Extend | Operating | Restart | 📎 Power Limited DB |
| Novovoronezh Annual Emergency Response Drill Completed: Radiation Detection, Fire, Evacuation Training Conducted | Operating | Restart | 📎 Power Limited DB |
| Baimskaya Mine First of Four Floating SMR Units Completed | Construction | SMR | 📎 Power Limited DB |
| Siberian Chemical Combine Site BREST-OD-300 300MW Lead-Cooled Fast Breeder Reactor Demonstration Plant Completes Concrete Pour | Construction | SMR | 📎 Power Limited DB |
| Dimitrovgrad Russia's MBIR Reactor Vessel Installed 8 Months Early, Targeting 2027 Operation | Construction | Sodium-Cooled Fast Neutron Research Reactor | 📎 World Nuclear News |
| Leningrad; Chukotka; Yakutia Rosatom Producing 8 RITM-200 Reactors for Icebreakers and SMR Projects, 6 for Uzbekistan | Construction | SMR | 📎 Power Limited DB |
| Seversk BREST-OD-300 Lead-Cooled Fast Breeder Reactor Demonstration Plant First Concrete Pour, Developing Closed Fuel | Construction | SMR | 📎 Power Limited DB |