⚡ PowerLimit Data Map

Romania nuclear & power projects

76 tracked · by stage: Under review 28 · EDA 9 · FEED 8 · MOU 6 · FID 5 · Construction 5 · updated 2026-10-24

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Cernavoda
Nuclearelectrica announces scheduled shutdown and grid disconnection of Cernavodă Unit 1 on the morning of Jul
In operationLarge Nuclear Plant📎 Power Limited DB
Cernavoda
Severe Danube drought limits cooling and process water, prompting controlled shutdown of Cernavoda Unit 1 from
In operationRestart📎 Power Limited DB
Cernavoda
Automatic shutdown due to an auxiliary equipment malfunction; restart date undetermined
OperatingRestart📎 Power Limited DB
Feldioara
Nuclearelectrica Subsidiary FPCU Feldioara Wins International Tender to Supply UO2 for Argentina’s PHWR Nuclea
In operationFuel fabrication (uranium conversion and UO2 fuel feedstock)📎 Nuclearelectrica Press Releases (English)
Cernavoda
Cernavoda Unit 1 begins scheduled maintenance outage
OperatingRestart📎 Power Limited DB
Cernavoda
€1.9 billion EPC contract signed for 30 additional years of operation at CANDU-6 Unit 1
ConstructionRestart📎 Power Limited DB
Cernavoda
Romania’s Nuclearelectrica Completes First Continuous Concrete Pour of About 3,470m³ for DIDR-U5 Intermediate-
ConstructionRestart📎 Power Limited DB
Cernavoda
European Commission Issues Positive Opinion on Technical and Safety Aspects of Completing Romania’s Cernavodă
ConstructionRestart📎 Power Limited DB
RATEN-ICN research center near Mioveni/Pitești, southern Romania
Ansaldo Nucleare-Reinvent Energy Consortium Wins Approximately €20 Million Contract to Design, Procure, Instal
ConstructionLead-cooled fast reactor (LFR) research facility📎 World Nuclear News
Doicesti
Romania’s Nuclearelectrica Shareholders Approve Final Investment Decision (FID) for 462MW Doicești SMR Project
ApprovedSMR📎 Power Limited DB
Doicești
Sweden's Alleima wins a second order from Doosan Enerbility for approximately 200 km of steam generator tubes
ApprovedSMR📎 Power Limited DB
Doicesti
Six NuScale 77 MW modules, financing mechanism to be detailed
FIDSMR📎 Power Limited DB
Doicești
Romania’s Nuclearelectrica Says Preliminary Site Investigations under IAEA Standards Confirm Suitability of Do
ApprovedSMR📎 Power Limited DB
ROU NUSCALE VOYGR
First of six VOYGR units (77MW × 6) to be built before the remaining five proceed sequentially; up to $4 billi
FIDSMR📎 Power Limited DB
Doicesti
U.S. Export-Import Bank grants final approval for a $98 million loan for preliminary services for the 462 MW N
ApprovedSMR📎 Power Limited DB
🔒 The full list of 76, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.