⚡ PowerLimit Data Map

Romania nuclear & power projects

75 tracked · by stage: Under review 27 · EDA 9 · FEED 8 · MOU 6 · FID 5 · Construction 5 · updated 2026-09-08

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Cernavoda
Cernavoda Unit 1 Shut Down Due to Danube Drought, Nuclearelectrica Receives Force Majeure Certificate
In operationRestart📎 Power Limited DB
Cernavoda
Drought Forces Cernavoda-1 Shutdown by Nuclearelectrica on July 28, 2026
In operationLarge reactor📎 Power Limited DB
Cernavoda
Automatic Shutdown Due to Auxiliary Equipment Malfunction, Restart Undetermined
OperatingRestart📎 Power Limited DB
Feldioara
Nuclearelectrica Subsidiary FPCU Feldioara Secures First UO2 Export to Argentina
In operationFuel Manufacturing (Uranium Conversion, UO2 Fuel Material)📎 Nuclearelectrica Press Releases (English)
Cernavoda
Cernavoda Unit 1 Begins Planned Outage
OperatingRestart📎 Power Limited DB
Cernavoda
Nuclearelectrica Completes First Concrete Pour for Cernavoda 1 Waste Facility
ConstructionRestart📎 Power Limited DB
Cernavoda
EU Commission Approves Cernavoda 3&4 (CANDU-6) Construction in Romania
ConstructionRestart📎 Power Limited DB
RATEN-ICN Research Center, Mioveni/Pitești Area, Southern Romania
Ansaldo Nucleare-Reinvent Energy Wins €20M ATHENA Lead-Cooled Fast Reactor Test Facility Contract in Romania
ConstructionLead-Cooled Fast Reactor (LFR) Research Facility📎 World Nuclear News
Cernavoda
CANDU-6 Unit 1: €1.9B EPC Contract for 30-Year Life Extension
ConstructionRestart📎 Power Limited DB
Doicești
Alleima Secures Second 200km NuScale SMR Steam Generator Tube Order from Doosan Enerbility for Doicești Plant
ApprovedSMR📎 Power Limited DB
Doicesti
Nuclearelectrica Shareholders Approve Doicești SMR FID, Project Moves to Implementation
ApprovedSMR📎 Power Limited DB
Doicesti
NuScale 77MW SMR: 6 Modules, Funding Mechanism to Be Detailed
FIDSMR📎 Power Limited DB
Doicești
Nuclearelectrica Confirms Doicești SMR Site Suitability, Moves to Licensing
ApprovedSMR📎 Power Limited DB
ROU NUSCALE VOYGR
VOYGR: First of Six 77MW Units to Begin Construction, Followed by Five More, Up to $4B from US EXIM
FIDSMR📎 Power Limited DB
Doicesti
US EXIM Bank Finalizes $98M Loan for Pre-Service of 462MW NuScale VOYGR-6 SMR Project at Romania's Doicesti Co
ApprovedSMR📎 Power Limited DB
🔒 The full list of 75, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.