Poland nuclear & power projects

146 tracked · by stage: Under review 82 · EDA 16 · Construction 10 · MOU 9 · Operating 9 · FEED 5 · updated 2026-10-24

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Świerk Research Center (approx. 30km southeast of Warsaw)
Poland's National Atomic Energy Agency Issues Indefinite Operating License for MARIA Research Reactor, Restart
In operationResearch Reactor📎 World Nuclear News
Lubiatowo-Kopalino
PEJ joins Poland’s mutual insurance association to secure project insurance for Poland’s first nuclear power p
ConstructionLarge Nuclear Plant📎 Power Limited DB
Site of Poland’s first nuclear power plant
IAEA Assesses Poland's Nuclear Program Infrastructure Readiness Positively as Bechtel Begins On-Site Work at P
ConstructionLarge Nuclear Plant📎 World Nuclear News
Lubiatowo-Kopalino
Three-unit AP1000 project: Unit 1 construction to begin in 2028; commercial operation targeted for 2036; Supre
ConstructionLarge Nuclear Plant📎 Power Limited DB
Katowicka Special Economic Zone
Last Energy signs power purchase agreement to build ten 20MWe microreactors at Poland's KSSE, targeting first-
ApprovedSMR📎 Power Limited DB
POLAND INDUSTRIA RR SMR
Poland’s Ministry of Climate and Environment approves decision-in-principle for state-owned Industria’s Rolls-
ApprovedSMR📎 World Nuclear News
Pomerania(Lubiatowo, Kopalino)
PEJ signs site-specific design and engineering services contract with Westinghouse and Bechtel for three AP100
ApprovedLarge Nuclear Plant📎 Power Limited DB
POL KGHM VOYGR
Polish copper and silver producer KGHM’s planned NuScale VOYGR SMR power plant (six 77 MWe modules, 462 MWe to
ApprovedSMR📎 Power Limited DB
Patnów-Konin
Poland issues decision-in-principle for two KHNP APR1400 reactors in Pątnów-Konin as its second large nuclear
ApprovedLarge Nuclear Plant📎 Power Limited DB
POL WESTINGHOUSE AP1000
Three AP1000 units: construction permit application planned for 2027, first concrete in 2028, and operation in
FIDLarge Nuclear Plant📎 Power Limited DB
Włocławek
BWRX-300 standard design agreement signed; up to 24 units planned in Poland, with first unit completion target
FEEDSMR📎 Power Limited DB
POL NCBJ HTGR
High-Temperature Gas-Cooled Reactor Basic Design Completed, Demonstration Operation Targeted for the 2030s, Co
FEEDSMR📎 Power Limited DB
Pomerania
Engineering contract signed for three AP1000 units; construction scheduled to begin in 2026
FEEDLarge Nuclear Plant📎 Power Limited DB
Baltic Sea Coast
AP1000 basic design underway; Bechtel-Toshiba cooperation MOU signed
FEEDLarge Nuclear Plant📎 Power Limited DB
Baltic Sea Coast
Basic design underway for three nuclear power plants; MOUs signed with 12 Polish companies
FEEDLarge Nuclear Plant📎 Power Limited DB
🔒 The full list of 146, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.