⚡ PowerLimit Data Map

Malaysia nuclear & power projects

17 tracked · by stage: Under review 11 · EDA 5 · Construction 1 · updated 2026-10-24

Leading projects (top 15 by stage)

ProjectStageTechnologySource
MYS IAEA BOREHOLE
Technical support for construction and operation of disused sealed source borehole disposal facility; construc
EDATBD (Policy Stage)📎 Power Limited DB
MALAYSIA PETRA NATIONAL NUCLEAR FEASIBILITY
Malaysia begins nuclear power feasibility study under 13th Malaysia Plan, guided by PETRA and MyPOWER, using I
Under review📎 World Nuclear News
MYS RUSSIA NATL
Talks on cooperation in peaceful nuclear use; preparations underway for MOU and agreement
Under reviewTBD (Policy Stage)📎 Power Limited DB
MYS MYPOWER NuclearRegulatory
Modernizing nuclear regulation and amending laws to lay groundwork for nuclear power as a national electricity
Under reviewTBD (Policy Stage)📎 Power Limited DB
MYS PETRA NUCLEAR
Considers introducing nuclear power within 10–15 years to achieve net zero by 2050; cooperates with ASEAN coun
Under reviewTBD (Policy Stage)📎 Power Limited DB
Peninsular Malaysia/Sabah
Nuclear Energy Feasibility Study Launched Under IAEA Guidelines; Candidate Sites Selected
Under reviewTBD (Policy Stage)📎 Power Limited DB
MYS ROSATOM AKADEMIKLOMONOSOV
Intergovernmental agreement (IGA) for floating nuclear power plant deployment in preparation
Under reviewSMR📎 Power Limited DB
MYS MOSTI NUCLEAR
Preliminary feasibility study completed; SMRs considered; six technology task forces recommended
Under reviewTBD (Policy Stage)📎 Power Limited DB
MAL ROSATOM NETR
Agreement reached with Russia on nuclear capacity-building cooperation covering legal and regulatory framework
Under reviewTBD (Policy Stage)📎 Power Limited DB
MYS PETRA NUCLEAR2050
Considers introducing nuclear power to achieve net zero by 2050, with ASEAN power grid interconnection under c
Under reviewTBD (Policy Stage)📎 Power Limited DB
Malaysia MYPOWER SMR
Nuclear licensing law and potential SMR adoption under review; power demand expected to reach 26 GW in 2030
Under reviewSMR📎 Power Limited DB
MYS GOVT NUCLEAR 13MP
Nuclear power introduction under review in 13th Malaysia Plan (2026–2030); legal and regulatory framework need
Under reviewTBD (Policy Stage)📎 Power Limited DB
XX 1836
Planned/Selected/Started | 2025
ConstructionTBD (Policy Stage)📎 Power Limited DB
XX 7494EDATBD (Policy Stage)📎 Power Limited DB
XX 2989
Start/Signing | 2021, 2030
EDATBD (Policy Stage)📎 Power Limited DB
🔒 The full list of 17, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.