17 tracked · by stage: Under review 11 · EDA 5 · Construction 1 · updated 2026-10-24
| Project | Stage | Technology | Source |
|---|---|---|---|
| MYS IAEA BOREHOLE Technical support for construction and operation of disused sealed source borehole disposal facility; construc | EDA | TBD (Policy Stage) | 📎 Power Limited DB |
| MALAYSIA PETRA NATIONAL NUCLEAR FEASIBILITY Malaysia begins nuclear power feasibility study under 13th Malaysia Plan, guided by PETRA and MyPOWER, using I | Under review | 📎 World Nuclear News | |
| MYS RUSSIA NATL Talks on cooperation in peaceful nuclear use; preparations underway for MOU and agreement | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| MYS MYPOWER NuclearRegulatory Modernizing nuclear regulation and amending laws to lay groundwork for nuclear power as a national electricity | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| MYS PETRA NUCLEAR Considers introducing nuclear power within 10–15 years to achieve net zero by 2050; cooperates with ASEAN coun | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| Peninsular Malaysia/Sabah Nuclear Energy Feasibility Study Launched Under IAEA Guidelines; Candidate Sites Selected | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| MYS ROSATOM AKADEMIKLOMONOSOV Intergovernmental agreement (IGA) for floating nuclear power plant deployment in preparation | Under review | SMR | 📎 Power Limited DB |
| MYS MOSTI NUCLEAR Preliminary feasibility study completed; SMRs considered; six technology task forces recommended | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| MAL ROSATOM NETR Agreement reached with Russia on nuclear capacity-building cooperation covering legal and regulatory framework | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| MYS PETRA NUCLEAR2050 Considers introducing nuclear power to achieve net zero by 2050, with ASEAN power grid interconnection under c | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| Malaysia MYPOWER SMR Nuclear licensing law and potential SMR adoption under review; power demand expected to reach 26 GW in 2030 | Under review | SMR | 📎 Power Limited DB |
| MYS GOVT NUCLEAR 13MP Nuclear power introduction under review in 13th Malaysia Plan (2026–2030); legal and regulatory framework need | Under review | TBD (Policy Stage) | 📎 Power Limited DB |
| XX 1836 Planned/Selected/Started | 2025 | Construction | TBD (Policy Stage) | 📎 Power Limited DB |
| XX 7494 | EDA | TBD (Policy Stage) | 📎 Power Limited DB |
| XX 2989 Start/Signing | 2021, 2030 | EDA | TBD (Policy Stage) | 📎 Power Limited DB |