386 tracked · by stage: Under review 261 · Operating 40 · MOU 28 · EDA 26 · Construction 18 · LOI 4 · updated 2026-09-08
| Project | Stage | Technology | Source |
|---|---|---|---|
| Cruas-Meysse Unit 2 EDF Restarts Cruas-Meysse 2 with Full ERU Core, Marking Milestone for French Uranium Recycling | In operation | Enriched Reprocessed Uranium (ERU) Recycled Fuel | 📎 World Nuclear News |
| France 2025 Nuclear Power Generation Hits 373TWh (6-Year High), Projected 345-375TWh for 2026-2028 | Operating | Large reactor | 📎 Power Limited DB |
| FRA ASNR LIFEEXTENSION Approval for 20 1,300MW 1980s-built reactors to extend operation from 40 to 50 years, requiring design updates | Operating | Restart | 📎 Power Limited DB |
| Flamanville EPR 1.6GW Connects to Grid Dec 20, Performance Tests Until Summer 2025, Scheduled Maintenance 2026 | Operating | Large reactor | 📎 Power Limited DB |
| All of France Grand Carénage Program Secures €5.8 Billion Green Loan for Existing Nuclear Plant Operations | Operating | Restart | 📎 Power Limited DB |
| Flamanville, Normandy EPR 1600MW Approved for Operation May 2024 After 12-Year Delay, Full Power by Year-End | Operating | Large reactor | 📎 Power Limited DB |
| FRA EDF CORROSION FIX Existing Reactor Corrosion Issues Targeted for Resolution by End of 2025, Pipe Weld Cracks Repaired | Operating | Restart | 📎 Power Limited DB |
| Tricastin Tricastin 1 Approved for 10-Year Extension, Requires Seismic and High-Temperature Safety Upgrades | Operating | Restart | 📎 Power Limited DB |
| Bugey Stress Corrosion Cracking Repaired, Reactor Restarting Oct 28 | Operating | Restart | 📎 Power Limited DB |
| Civaux, Chooz N4·P'4 reactor piping stress corrosion response strategy approved, full inspection planned by end of 2025 | Operating | Restart | 📎 Power Limited DB |
| Chinon, Civaux, Chooz, Penly, Cattenom, Bugey, Flamanville, Golfech SIS Pipe Corrosion Prompts 12 Nuclear Plant Inspections, 5% Drop in French Output | Operating | Restart | 📎 Power Limited DB |
| Cormeilles-en-Parisis Naarea Launches I-Lab Non-Nuclear Test Facility for XAMR Molten Salt Fast Micro-Reactor | Construction | SMR | 📎 World Nuclear News |
| SGL Chedde Plant (France) and US Processing Facilities X-energy to Invest Up to $8 Million in Phases to Double SGL Carbon's NBG-18 Graphite Production by 2030, Suppl | Construction | SMR Materials: Reactor-Grade Graphite NBG-18, Xe-100 | 📎 X-energy News |
| FRA EDF EPR2 EPR2: Plans to Construct Six Units Underway | Construction | Large reactor | 📎 Power Limited DB |
| Georges Besse II uranium enrichment plant Orano Expands Georges Besse II Enrichment Plant in France, First Concrete Pour October, Production Aimed for 2 | Construction | Uranium enrichment (Fuel cycle) | 📎 World Nuclear News |