386 tracked · by stage: Under review 262 · Operating 40 · MOU 28 · EDA 26 · Construction 18 · Other 3 · updated 2026-10-24
| Project | Stage | Technology | Source |
|---|---|---|---|
| Chinon, Civaux, Chooz, Penly, Cattenom, Bugey, Flamanville, Golfech SIS piping corrosion prompts inspections at 12 nuclear plants, French nuclear output falls 5% | Operating | Restart | 📎 Power Limited DB |
| Cruas-Meysse nuclear plant Unit 2 EDF restarts Cruas-Meysse Unit 2 with a full core of enriched reprocessed uranium (ERU), marking a milestone i | In operation | Enriched reprocessed uranium (ERU) recycled fuel | 📎 World Nuclear News |
| France 2025 nuclear power generation hits 373TWh (6-year high); 2026-2028 projected range 345-375TWh | Operating | Large Nuclear Plant | 📎 Power Limited DB |
| FRA ASNR LIFEEXTENSION India Extends 20 1,300MW Nuclear Plants from 40 to 50 Years, Requires Design Updates and Material Replacement | Operating | Restart | 📎 Power Limited DB |
| Flamanville 1.6GW EPR connected to grid on December 20; performance testing through summer 2025, scheduled maintenance in | Operating | Large Nuclear Plant | 📎 Power Limited DB |
| France Nationwide €5.8 Billion Green Loan Agreement Signed to Support Continued Operation of Existing Nuclear Plants Through Gra | Operating | Restart | 📎 Power Limited DB |
| Flamanville, Normandy 1600MW EPR approved for operation in May 2024 after 12-year delay, targeting full-power operation by year-end | Operating | Large Nuclear Plant | 📎 Power Limited DB |
| FRA EDF CORROSION FIX Corrosion issues at existing nuclear plant targeted for resolution by end-2025; cracked pipe welds to be repai | Operating | Restart | 📎 Power Limited DB |
| Tricastin Tricastin Unit 1 approved for 10-year operating extension after 40 years following commissioning in 1980; addi | Operating | Restart | 📎 Power Limited DB |
| Bugey Stress corrosion cracking repairs completed; restart set for October 28 | Operating | Restart | 📎 Power Limited DB |
| Civaux, Chooz Strategy approved to address stress corrosion in N4 and P'4 reactor piping; comprehensive inspections planned | Operating | Restart | 📎 Power Limited DB |
| Cormeilles-en-Parisis French microreactor developer Naarea opens I-Lab non-nuclear testing facility and laboratory in Cormeilles-en- | Construction | SMR | 📎 World Nuclear News |
| Georges Besse II uranium enrichment plant Orano advances expansion of France's Georges Besse II enrichment plant, targeting first concrete this October | Construction | Uranium Enrichment (Fuel Cycle) | 📎 World Nuclear News |
| SGL plant in Chedde, France, alongside processing facilities in the United States X-energy to invest up to $8 million in phases to double reactor-grade isostatic graphite (NBG-18) capacity at | Construction | SMR materials (reactor-grade graphite NBG-18, Xe-100 | 📎 X-energy News |
| FRA EDF EPR2 Construction of six EPR2 reactors planned | Construction | Large Nuclear Plant | 📎 Power Limited DB |