⚡ PowerLimit Data Map

Finland nuclear & power projects

148 tracked · by stage: Under review 80 · Operating 31 · EDA 14 · Construction 10 · MOU 10 · LOI 1 · updated 2026-09-08

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Olkiluoto
EPR Unit 1 Begins Commercial Operation, Accounts for 14% of Finland's Power Generation
OperatingLarge reactor📎 Power Limited DB
Loviisa
Two VVER-440 Units to Use Russian Fuel Until 2030, Operating License Extension Application for 2050
OperatingRestart📎 Power Limited DB
Olkiluoto
Low- and Intermediate-Level Radioactive Waste Repository Approved for Operation Until 2051, Safety Assessed Ev
OperatingRestart📎 Power Limited DB
Olkiluoto
EPR Reaches 100% Power, Supplies 40% of Finland's Electricity Demand
OperatingLarge reactor📎 Power Limited DB
Olkiluoto
Olkiluoto 1, 2 Operational; Unit 3 Commercial Operation Expected February 2022
OperatingLarge reactor📎 Power Limited DB
Olkiluoto
Olkiluoto 2 Maintenance Completed, Connected to Grid
OperatingRestart📎 Power Limited DB
Olkiluoto
Olkiluoto 3 to Get 90MW Backup Energy Storage System
OperatingRestart📎 Power Limited DB
Hanhikivi
Rosatom's Hanhikivi-1 Project Undergoes First Remote STUK Inspection
ConstructionLarge reactor📎 Power Limited DB
FIN FORTUM LARGENUCLEAR
Fortum Selects Westinghouse-Hyundai E&C Consortium as EWA Partner for New Large NPP
ConstructionLarge reactor📎 Power Limited DB
Vuosaari, Salmisaari, Norrberget
Helsinki Selects 3 SMR Sites for District Heating, Phase 1 by 2026
EDASMR📎 Power Limited DB
Olkiluoto
Automation, Control System, Steam Separator Replacement; 10-20 Year Operating Extension and 890MW to 970MW Out
EDARestart📎 Power Limited DB
FIN WESTINGHOUSE AP1000
AP1000: Feasibility Study for Adoption, EWA Signed for Site Evaluation & Licensing Consultation
EDALarge reactor📎 Power Limited DB
FIN FORTUM HYUNDAIWESTINGHOUSE AP1000
Hyundai E&C-Westinghouse Consortium Chosen as Fortum's EWA Partner After 2-Year Feasibility Study
EDALarge reactor📎 Power Limited DB
Olkiluoto
Olkiluoto 1 & 2 Life Extension (Min. 10 Years) and 80 MWe Uprate Environmental Assessment Begins, 1.2 TWh Addi
EDARestart📎 Power Limited DB
Loviisa
Two VVER-440 Units: Safety Confirmed for Life Extension Until 2050, Obsolescence Management Plan Established
EDARestart📎 Power Limited DB
🔒 The full list of 148, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.