149 tracked · by stage: Under review 79 · Operating 31 · EDA 13 · Construction 10 · MOU 10 · In operation 2 · updated 2026-10-24
| Project | Stage | Technology | Source |
|---|---|---|---|
| Loviisa Two VVER-440 reactors to use Russian fuel through 2030, operating license extension to 2050 requested | Operating | Restart | 📎 Power Limited DB |
| FINLAND FORTUM NPP GOOGLE PPA Google to invest €13 billion ($21 billion) in Finnish AI infrastructure over two years, signs first nuclear de | In operation | Large Nuclear Plant | 📎 Google News - Europe Nuclear |
| Loviisa Google announces at least €13 billion ($15.1 billion) in Finnish AI infrastructure investment over two years, | In operation | Restart | 📎 Power Limited DB |
| Olkiluoto EPR Unit 1 begins commercial operation, accounting for 14% of Finland's electricity generation | Operating | Large Nuclear Plant | 📎 Power Limited DB |
| Olkiluoto Low- and intermediate-level radioactive waste repository approved to operate through 2051, with safety assessm | Operating | Restart | 📎 Power Limited DB |
| Olkiluoto EPR reaches 100% output, supplying 40% of Finland's electricity demand | Operating | Large Nuclear Plant | 📎 Power Limited DB |
| Olkiluoto Olkiluoto Units 1 and 2 operating; Unit 3 scheduled for commercial operation in February 2022 | Operating | Large Nuclear Plant | 📎 Power Limited DB |
| Olkiluoto Olkiluoto Unit 2 completes maintenance and reconnects to the grid | Operating | Restart | 📎 Power Limited DB |
| Olkiluoto Olkiluoto Unit 3 to add 90MW backup energy storage system | Operating | Restart | 📎 Power Limited DB |
| Hanhikivi Rosatom (RAOS Project Oy) Builds Finland’s Hanhikivi-1 Nuclear Plant (1200MWe AES-2006 VVER) as STUK Conducts | Construction | Large Nuclear Plant | 📎 Power Limited DB |
| FIN FORTUM LARGENUCLEAR Fortum Selects Westinghouse–Hyundai Engineering & Construction Consortium as EWA Partner for New Large Nuclear | Construction | Large Nuclear Plant | 📎 Power Limited DB |
| Nuclear Engineering Research Laboratory at LUT's Lappeenranta campus (test facility) Finland’s LUT University to build two test facilities over the next two years under the €24 million EU-co-fund | Approved | SMR | 📎 World Nuclear News |
| FIN FORTUM HYUNDAIWESTINGHOUSE AP1000 Fortum Selects Hyundai Engineering & Construction–Westinghouse Consortium as EWA Partner for New Large Nuclear | EDA | Large Nuclear Plant | 📎 Power Limited DB |
| Vuosaari, Salmisaari, Norrberget Three candidate SMR sites selected for Helsinki district heating; Phase 1 completion scheduled for 2026 | EDA | SMR | 📎 Power Limited DB |
| Olkiluoto Automation and control systems and steam separators to be replaced; 10–20-year operating life extension and po | EDA | Restart | 📎 Power Limited DB |