⚡ PowerLimit Data Map

China nuclear & power projects

335 tracked · by stage: Under review 169 · Operating 75 · Construction 53 · MOU 14 · EDA 11 · Other 6 · updated 2026-09-08

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Haiyang
Nuclear Heating Business Provides Carbon-Free Winter Heating
OperatingIndustry📎 Power Limited DB
Shidaowan
CAP1400 Demo Reactor Guohe One Unit 1 Grid Connected, Unit 2 Under Construction
OperatingLarge reactor📎 Power Limited DB
Taipingling (Huizhou, Guangdong Province)
China's Taipingling NPP Unit 2 in Guangdong province begins power supply after grid connection
In operationLarge Nuclear Power Plants: HPR1000/Hualong One📎 World Nuclear News
Lianyungang
Nuclear Steam to Supply Petrochemical Plants with 4.8M Tons Annually, Replacing 400K Tons of Coal
OperatingSMR📎 Power Limited DB
Fangchenggang; Haiyang; Sanmen; Taishan; Xiasu
China's Fangchenggang Unit 4 (HPR1000) successfully connected to grid on April 9, 2024, commercial operation i
In operationLarge reactor📎 Power Limited DB
Tianwan
Tianwan Unit 6 Begins Commercial Operation, Units 5-6 to Cut 13.6M Tons CO2 Annually; Units 7-8 Expected 2026-
OperatingLarge reactor📎 Power Limited DB
Fuqing
Hualong One 1161MW Unit Begins Commercial Operation
OperatingLarge reactor📎 Power Limited DB
Shidaowan
HTR-PM Unit 2 Achieves First Criticality, 600MWe Commercialization Planned
OperatingSMR📎 Power Limited DB
China Institute of Atomic Energy (CIAE) Near Beijing
China Experimental Fast Reactor (CEFR) completes power test commissioning, ready for operation after July 2020
In operationSodium-Cooled Fast Reactor (Experimental)📎 World Nuclear News
Fuqing
Grid Connected January 2022, Maximum Output Achieved February
OperatingLarge reactor📎 Power Limited DB
Fuqing
Hualong One Unit 6 Connected to Grid, China's Second Hualong One Plant
OperatingLarge reactor📎 Power Limited DB
CHN ROSATOM CFR600
CFR-600 Fuel Supply Contract Signed, Fuel Assembly Production to Begin 2022
OperatingSMR📎 Power Limited DB
Taishan
Taishan-1 Fuel Rod Damage Estimated at 70 Bundles, EPR Design Flaws Cited
OperatingLarge reactor📎 Power Limited DB
Shandong
HTR-PM Units 1 & 2 Begin Fuel Loading, Receive Operating Licenses, Grid Connection Expected This Year
OperatingSMR📎 Power Limited DB
Qinshan
Qinshan NPP District Heating Project Targets 4 Million m² by 2025 Using 7 Reactors
OperatingRestart📎 Power Limited DB
🔒 The full list of 335, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.