335 tracked · by stage: Under review 169 · Operating 75 · Construction 53 · MOU 14 · EDA 11 · Other 6 · updated 2026-09-08
| Project | Stage | Technology | Source |
|---|---|---|---|
| Haiyang Nuclear Heating Business Provides Carbon-Free Winter Heating | Operating | Industry | 📎 Power Limited DB |
| Shidaowan CAP1400 Demo Reactor Guohe One Unit 1 Grid Connected, Unit 2 Under Construction | Operating | Large reactor | 📎 Power Limited DB |
| Taipingling (Huizhou, Guangdong Province) China's Taipingling NPP Unit 2 in Guangdong province begins power supply after grid connection | In operation | Large Nuclear Power Plants: HPR1000/Hualong One | 📎 World Nuclear News |
| Lianyungang Nuclear Steam to Supply Petrochemical Plants with 4.8M Tons Annually, Replacing 400K Tons of Coal | Operating | SMR | 📎 Power Limited DB |
| Fangchenggang; Haiyang; Sanmen; Taishan; Xiasu China's Fangchenggang Unit 4 (HPR1000) successfully connected to grid on April 9, 2024, commercial operation i | In operation | Large reactor | 📎 Power Limited DB |
| Tianwan Tianwan Unit 6 Begins Commercial Operation, Units 5-6 to Cut 13.6M Tons CO2 Annually; Units 7-8 Expected 2026- | Operating | Large reactor | 📎 Power Limited DB |
| Fuqing Hualong One 1161MW Unit Begins Commercial Operation | Operating | Large reactor | 📎 Power Limited DB |
| Shidaowan HTR-PM Unit 2 Achieves First Criticality, 600MWe Commercialization Planned | Operating | SMR | 📎 Power Limited DB |
| China Institute of Atomic Energy (CIAE) Near Beijing China Experimental Fast Reactor (CEFR) completes power test commissioning, ready for operation after July 2020 | In operation | Sodium-Cooled Fast Reactor (Experimental) | 📎 World Nuclear News |
| Fuqing Grid Connected January 2022, Maximum Output Achieved February | Operating | Large reactor | 📎 Power Limited DB |
| Fuqing Hualong One Unit 6 Connected to Grid, China's Second Hualong One Plant | Operating | Large reactor | 📎 Power Limited DB |
| CHN ROSATOM CFR600 CFR-600 Fuel Supply Contract Signed, Fuel Assembly Production to Begin 2022 | Operating | SMR | 📎 Power Limited DB |
| Taishan Taishan-1 Fuel Rod Damage Estimated at 70 Bundles, EPR Design Flaws Cited | Operating | Large reactor | 📎 Power Limited DB |
| Shandong HTR-PM Units 1 & 2 Begin Fuel Loading, Receive Operating Licenses, Grid Connection Expected This Year | Operating | SMR | 📎 Power Limited DB |
| Qinshan Qinshan NPP District Heating Project Targets 4 Million m² by 2025 Using 7 Reactors | Operating | Restart | 📎 Power Limited DB |