⚡ PowerLimit Data Map

China nuclear & power projects

336 tracked · by stage: Under review 169 · Operating 75 · Construction 54 · MOU 14 · EDA 10 · Other 6 · updated 2026-10-24

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Taipingling (Huizhou, Guangdong)
Taipingling Unit 2 in Guangdong, China, begins supplying power after grid connection
In operationLarge-scale reactor (HPR1000/Hualong One)📎 World Nuclear News
Zhangzhou
China’s Zhangzhou Unit 2 (Hualong One HPR1000) in Fujian achieves first grid connection on November 22, 2025,
In operationLarge Nuclear Plant📎 Power Limited DB
Qinshan
Qinshan Phase III Unit 1 (Candu-6) Sets Record with 738-Day Continuous Operation, Nears Refurbishment for Life
In operationRestart📎 Power Limited DB
Qinshan
District heating project using seven Qinshan nuclear reactors targets heating supply to 4 million m² by 2025
OperatingRestart📎 Power Limited DB
Haiyang
Nuclear heating project supplies carbon-free winter heating
OperatingIndustry📎 Power Limited DB
Shidaowan
CAP1400 demonstration reactor Guohe One Unit 1 connected to grid; Unit 2 under construction
OperatingLarge Nuclear Plant📎 Power Limited DB
Lianyungang
Nuclear steam to supply petrochemical plant with 4.8 million tonnes annually, replacing 400,000 tonnes of coal
OperatingSMR📎 Power Limited DB
Fangchenggang; Haiyang; Sanmen; Taishan; Xiasu
China's Fangchenggang Unit 4 (Hualong One HPR1000) connects to the grid on April 9, 2024, ahead of commercial
In operationLarge Nuclear Plant📎 Power Limited DB
Tianwan
Tianwan Unit 6 enters commercial operation; Units 5–6 cut annual carbon emissions by 13.6 million tonnes; Unit
OperatingLarge Nuclear Plant📎 Power Limited DB
Fuqing
1,161 MW Hualong One reactor begins commercial operation
OperatingLarge Nuclear Plant📎 Power Limited DB
Shidaowan
Unit 2 of the two-reactor HTR-PM demonstration plant (250 MWt each) achieves first criticality; 600 MWe commer
OperatingSMR📎 Power Limited DB
China Institute of Atomic Energy (CIAE) near Beijing
China Experimental Fast Reactor (CEFR) completes full-power manual emergency shutdown test in July 2020, concl
In operationSodium-cooled fast reactor (experimental)📎 World Nuclear News
Fuqing
Grid connection in January 2022, maximum output achieved in February
OperatingLarge Nuclear Plant📎 Power Limited DB
Fuqing
Hualong One Unit 6 connected to the grid at China’s second Hualong One nuclear power plant
OperatingLarge Nuclear Plant📎 Power Limited DB
CHN ROSATOM CFR600
Fuel Supply Contract Signed for Fast Neutron Demonstration Reactor (CFR-600), Fuel Assembly Production Started
OperatingSMR📎 Power Limited DB
🔒 The full list of 336, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.