⚡ PowerLimit Data Map

Bulgaria nuclear & power projects

79 tracked · by stage: Under review 46 · EDA 13 · FEED 8 · Operating 6 · MOU 3 · Construction 1 · updated 2026-09-08

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Kozloduy
VVER-1000 Units 5 & 6: 20-Year Maintenance and I&C System Obsolescence Management Contract Signed
OperatingLarge reactor📎 Power Limited DB
Kozloduy
Russia Establishes Alternative Nuclear Fuel Supply Chain with 10-Year, 5.7 Million Pound Enriched Uranium Cont
OperatingRestart📎 Power Limited DB
Kozloduy
Kozloduy Unit 5 Signs 10-Year Fuel Supply Contract, Replacing Russian Fuel
OperatingRestart📎 Power Limited DB
Kozloduy
Unit 5 Undergoing Planned Maintenance
OperatingRestart📎 Power Limited DB
Kozloduy
Kozloduy Units 7 & 8 New Build: Unit 7 Commercial Operation by 2035, Nuclear Cooperation with France
ConstructionLarge reactor📎 Power Limited DB
Kozloduy
AP1000 2 Units: FID Expected H2 2026, $14 Billion Project Cost, Targeting Over 30% Localization
FIDLarge reactor📎 Power Limited DB
Kozloduy
AP1000 Units 7 & 8 Design Contract Signed, Operations Planned for 2035 and 2037
FEEDLarge reactor📎 Power Limited DB
Kozloduy
Engineering Contract Extended by 14 Months; First Concrete Target 2030
FEEDLarge reactor📎 Power Limited DB
Kozloduy
AP1000 Units 7 & 8 FEED Contract Extended, Hyundai E&C Preferred Bidder, 2035-2037 Commercial Operation Target
FEEDLarge reactor📎 Power Limited DB
Kozloduy
AP1000: Supply Chain Expansion, MOUs with 17 Bulgarian Companies for Parts & Services
FEEDLarge reactor📎 Power Limited DB
Kozloduy
2 New AP1000 Units Planned for 2035 Commercial Operation, Hyundai E&C Selected as Preferred Bidder
FEEDLarge reactor📎 Power Limited DB
Kozloduy
Hyundai E&C Sole Qualified Bidder for Kozloduy Units 7 & 8, Forms Consortium with WEC
FEEDLarge reactor📎 Power Limited DB
Kozloduy
Unit 7 Targeted for 2033 Completion, Unit 8 2-3 Years Later, Total 2,300MW New Construction
FEEDLarge reactor📎 Power Limited DB
Kozloduy
FEED Contract Signed for 1-2 AP1000 Units, Existing Site Infrastructure Assessment Underway
FEEDLarge reactor📎 Power Limited DB
Kozloduy
Unit 7 Targets 2035 Operation, Unit 8 Targets 2037 Operation
EDALarge reactor📎 Power Limited DB
🔒 The full list of 79, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.