⚡ PowerLimit Data Map

Argentina nuclear & power projects

44 tracked · by stage: Under review 18 · Construction 15 · Operating 5 · EDA 4 · FID 1 · MOU 1 · updated 2026-10-24

Leading projects (top 15 by stage)

ProjectStageTechnologySource
Atucha
Operating License Extended by 10 Years Through 2036
OperatingLarge Nuclear Plant📎 Power Limited DB
Atucha
Atucha Unit 2 operating license renewed for two years through May 2026; restarted in August 2023
OperatingRestart📎 Power Limited DB
Argentina's CONUAR nuclear plant equipment
Export of 10 shielding plugs to China's Qinshan Unit 3
OperatingTBD📎 Power Limited DB
ARG CNEA CAREM
CNEA and state-owned nuclear operator Nucleoeléctrica sign two-year technical support framework agreement and
ConstructionSMR📎 Power Limited DB
Ezeiza Atomic Centre (Buenos Aires Province)
The 30MWt multipurpose RA-10 research reactor for medical radioisotope production and fuel and materials irrad
ConstructionResearch reactor (multipurpose open-pool type)📎 World Nuclear News
Atucha
Argentina's nuclear power corporation and China National Nuclear Corporation sign EPC contract for Atucha 3 us
ConstructionLarge Nuclear Plant📎 Power Limited DB
ARG DOUGLASConstructionSMR📎 Power Limited DB
CernavodaConstructionSMR📎 Power Limited DB
CooperConstructionSMR📎 Power Limited DB
Cernavoda
2027 Operation Target
ConstructionSMR📎 Power Limited DB
CernavodaConstructionSMR📎 Power Limited DB
CernavodaConstructionSMR📎 Power Limited DB
CernavodaConstructionSMR📎 Power Limited DB
CernavodaConstructionSMR📎 Power Limited DB
CernavodaConstructionSMR📎 Power Limited DB
🔒 The full list of 44, per-project timelines, source links to news and filings, next checkpoints and PowerLimit’s reading are for members.
Full records, analysis and source links are for members.
News, filings and regulatory documents collected since 2020 — with PowerLimit’s reading of them — are available on the interactive map and through YouTube membership.